Lansing Correctional Facility received a 35,000 sq. ft. full roof replacement designed to ensure long-term protection and structural integrity. A fully adhered Versico 60 mil TPO roofing system was installed, replacing the
existing roof down to the concrete deck. This high-performance system was selected for its durability, energy efficiency, and resistance to harsh weather conditions, meeting the demands of the Midwest climate.
Execution of the project within a high-security correctional environment required precise coordination, strict compliance with safety protocols, and efficient teamwork to minimize disruption while maintaining ongoing facility operations. Securing the building envelope contributed to the overall safety and functionality of the facility and, by extension, supported broader community security.