Fraud Blocker

Kiewit

Scope

Location

Scale

System

The project involved a complete roofing overhaul across five roof sections, totaling 39,000 sq. ft. Our team installed a Carlisle 60 mil TPO system with a multi-layer insulation assembly and a self-adhered vapor retarder for maximum energy efficiency and weather protection.

Additional enhancements included a Hanover paver/pedestal system to improve rooftop functionality and aesthetics, along with custom-fabricated aluminum coping for edge protection and a refined architectural finish.

  • Installed a Carlisle TPO roofing system engineered for durability, energy efficiency, and long-term performance.
  • Applied a fully adhered 60mil TPO membrane to ensure superior weather resistance and UV protection.
  • Fabricated and installed custom aluminum coping to protect roof perimeters and deliver a clean, finished appearance.

Kiewit’s corporate facility sits within Lenexa’s growing business corridor, a modern hub that reflects the city’s expansion as a center for engineering and innovation in the Kansas City metro. As the central office for one of North America’s most respected construction firms, the facility demands a roofing system that delivers both performance and longevity.

JR&CO’s work on this project reflects our expertise in commercial roofing for complex corporate environments, where precision and reliability are essential. By integrating advanced materials and craftsmanship, we delivered a system that protects both the structure and the reputation it represents.

Choosing Kiewit for this portfolio highlights our capability to deliver large-scale commercial roofing projects where performance, quality, and long-term value are equally demanded.

Overview

The Kiewit project in Lenexa, Kansas, consisted of a complete roofing overhaul spanning approximately 39,000 square feet across five separate roof sections. A Carlisle roofing system was installed, selected for its durability and energy efficiency. The system featured a multi-layer insulation assembly designed to enhance thermal performance, a self-adhered vapor retarder for effective moisture control, and a fully adhered 60mil TPO membrane to provide superior resistance to weathering and UV exposure.


To increase rooftop functionality and visual appeal, a Hanover paver/pedestal system was incorporated into the design. The project was completed with the fabrication and installation of aluminum coping along all roof edges, delivering a clean, finished appearance while adding an extra layer of protection.

Ready to Work With Us?