JR&CO completed a full roof replacement at the University of Missouri-Kansas City’s Miller Nichols Library, installing approximately 35,000 square feet of gray Versico 60 mil TPO. Work took place during a period of frequent rainfall, requiring careful planning and sequencing as the existing roofing system was removed and the new assembly installed while protecting the occupied academic facility below.

  • Installed 35,000 sq. ft. of Versico 60-mil gray TPO on UMKC’s Miller Nichols Library during a rainy season without interior damage.
  • Completed tear-off and installation over an active academic facility with minimal punch-list items at closeout.
  • Served as prime contractor, coordinating project participation with MBE and WBE partners to meet state requirements.

Miller Nichols Library serves as a central academic resource for the UMKC campus, making maintaining a secure and watertight building envelope especially important. The project demonstrates JR&CO’s ability to navigate challenging weather conditions while performing roofing work on an active institutional facility where protecting people, resources and ongoing operations is critical.

Overview

UMKC Miller Nichols Library is a central academic facility on the University of Missouri–Kansas City campus, and JR&CO completed a full roofing replacement on the structure. The project involved installing 35,000 square feet of Versico 60-mil TPO in gray. Work occurred during a rainy period, requiring extensive planning to safely remove the existing roofing system over active library spaces without causing interior damage.


JR&CO served as the prime contractor and coordinated with both MBE and WBE partners to meet state participation requirements. The project team planned material staging, weather monitoring, and sequencing strategies to maintain continuous building protection throughout tear-off and installation.


Despite seasonal weather challenges and the sensitivity of working above occupied academic areas, the project progressed without incident. Field conditions did not require significant design adjustments, and only a minimal punch list was generated at closeout. The roofing system was completed within the intended schedule parameters and restored watertight integrity to the facility.